May 1984 to September 1988 summary of Fort Irwin, CA, family housing comparison test operation and maintenance costs of manufactured vs. conventionally built units /
Main Author: | Neathammer, R. D (Robert D.) |
---|---|
Corporate Author: | Construction Engineering Research Laboratory (U.S. : 1969-1992) |
Format: | Government Document Book |
Language: | English |
Published: |
Champaign, Ill. : [Springfield, VA :
US Army Corps of Engineers, Construction Engineering Research Laboratory ; National Technical Information Service, distributor,
1989]
|
Series: | USA-CERL interim report
P-89/14 |
Subjects: |
Similar Items
-
Three-year summary of Fort Irwin, CA, family housing comparison test operation and maintenance costs of manufactured vs. conventionally built units /
by: Neathammer, R. D (Robert D.)
Published: (1987) -
Eight-year summary of Fort Irwin, CA, family housing comparison test operation and maintenance costs of manufactured vs. conventionally built units /
by: Neathammer, R. D (Robert D.)
Published: (1993) -
Seven-year summary of Fort Irwin, CA, family housing comparison test operation and maintenance costs of manufactured vs. conventionally built units /
by: Neathammer, R. D (Robert D.)
Published: (1992) -
Two-year summary of Fort Irwin, CA, family housing comparison test : operation and maintenance costs of manufactured vs. conventionally built units /
by: Neathammer, R. D (Robert D.)
Published: (1986) -
Nine-year summary of Fort Irwin, CA, family housing comparison test operation and maintenance costs of manufactured vs. conventionally built units /
by: Neathammer, R. D (Robert D.)
Published: (1994)